LBJ High School

Austin, TX

1/7

Project Description:

Replaced exterior metal stairs. Installed additional exterior security lighting. Improved storm/site drainage in selected areas. Replaced deteriorated exterior doors, frames, and hardware. Repaired structural concrete and repair/repoint brick masonry. Replaced approximately 165,000 SF of built-up roofing. Provided moisture-resistant ceiling and grid in the kitchen. Install wood floor and ballet bar in dance room. Repaired/replaced lockers in the boy’s PE dressing room. Repaired/replaced damaged student lockers. Renovated faculty restrooms. Renovated/refurbished student restrooms. Replaced deteriorated HVAC system equipment in selected areas. Provided electrical and data outlets in computer labs and library. Installed water heater in the life skills classroom. Constructed new theater arts building. Remodeled the library. Remodeled existing auditorium into classroom space. Enlarged and renovated selected science classrooms. Installed Safety and Security enhancements.

-Native American Owned-

DEDICATED OWNER'S REPRESENTATION

SQ1 Office - Austin, Texas

Phone Number
Email
  • Facebook - White Circle
  • LinkedIn - White Circle
  • Instagram - White Circle

© Copyright 2019 Square One Consultants All Rights Reserved