Burnet Middle School

Austin, TX

1/1

Project Description:

Constructed additional parking spaces in selected areas. Repaved student drop-off drive on the south side of the building. Installed additional exterior security lighting. Improved grading and construct concrete drainage structures in the gymnasium area. Installed concrete paving at the service drive. Resurfaced existing tennis and outdoor basketball courts. Constructed a sidewalk along the south side of the cafeteria. Repaired/replaced deteriorated exterior metal doors, frames, and hardware. Replaced approximately 80,000 SF of built-up roofing. Repaired/replaced the window wall system in the 100/200-classroom wing. Installed elevator for the 100/200-classroom wing. Renovated/refurbished student and faculty restrooms. Refurbished casework in science and fine arts classrooms. Replaced clock system. Replaced deteriorated exhaust fans in student and faculty restrooms. Repaired/replaced/modified selected HVAC system equipment. Installed emergency egress lighting. Installed additional electrical circuits for computer classrooms. Constructed an addition to girl’s and boy’s athletic dressing/locker areas. Expanded the cafeteria stage to provide dressing rooms and storage. Installed Safety and Security enhancements.

-Native American Owned-

DEDICATED OWNER'S REPRESENTATION

SQ1 Office - Austin, Texas

Phone Number
Email
  • Facebook - White Circle
  • LinkedIn - White Circle
  • Instagram - White Circle

© Copyright 2019 Square One Consultants All Rights Reserved